Tuesday, November 22, 2016

NKY AND RTCC WEEKLY MEETING AT AL ARDHA SITE 32-32H

                 Weekly Meeting held at Al Ardha Site 32-32H on November 21, 2016 and being presided by NKY Area Manager Engr. Ameer Abu El Nasr together with the NKY Engineers and RTCC Project Manager Engr.Muhammad Al Falah, Engr. Al Mothana Kadro Construction Manager and Engr. Sharaf,Engr. Ahmad Abazeed EE, Engr John De Leon ME,Engr. Melvin Agno Safety.

                 The Meeting tackled regarding the Concrete Pouring Request, Site Instruction (SI), Non Conformance Report (NCR), Specification, Documents and Procedures, QA/QC Issues with regards to the works of Civil, Architectural, Electrical and Mechanical.










































Saturday, October 22, 2016

SITE VISIT OF THE NEW NKY AREA MANAGER TO SITE 32-32H


                     Another Site visit of the NKY Site Manager Engr.Shamsuddin Lakho and New Area Manager Ameer Abo Al Naser last  October 13, 2016.together with outgoing Area Manager Engr. Abdul Wahab Memon.They stayed for 3 hours on the site to inspect and roam around every building on which building in on progress.



From Left to Right : Engr.Almothana Kadro Construction Manager Site 32/32H, Engr. Khalid Mohammadiah Project Manager Site 35/35H, Engr.Ameer Abo Al Naser Area Manager NKY, Engr. Abdul Wahab Memon Outgoing Area Manager, Engr.Shamsuddin Lakho NKY Site Manager, Engr. Muhammad Al Falah Project Manager Site 32/32H and Engr Nasser Mohammed Ahmed NKY Engineer











Inspection and checking of Main Dormitory 401 















Checking and inspection of Formworks and Main Dormitory 401










Going to Musical Building 1100 at the First Floor Slab to inspect the Slab