NKY Consultant Engineers for Al Ardha Site 32-32H

Engr Amir Adli Abu El Nasr
KAP2C1- Area Manager


Engr Abdul Fareed Sheikh
Senior Site Infrastructural Engineer


Engr Saifullah Taj Khan
Quantity Surveyor


Engr Taher Malik
NKY Document Controller



Engr Juan Cesar Sabater
Senior Site Electrical Engineer


Engr Ramu Sonaimuthu
Electrical Supervisor


Arch. Dennis Jamias Cabanos
Senior Site Architect


Arch Muhammad Walliullah Jamil
Site Architect

Engr Ahmad Ali
Architectural Supervisor


Engr Deyaa Tawfik
Civil Site Engineer

Engr Ahmed Abdul Majeed
Civil Supervisor

Engr Asadullah Sundkey
Mechanical Site Engineer

Engr Najim Iqbal
Site Surveyor










Mark Up/Red Line Drawing Preparation and Approval



               Mark up/Red Line drawing checking with NKY Area Manager Engr Ameer Abu El Nasr in his office Al Ardha Site 32-32H
   

                  NKY Area Manager Engr Ameer Abu El Nasr together with Engr Nasser(Civil Engineer-left) and Arch Walli Ullah (Architect-center) having a discussion regarding the mark up/red line drawing process in which RTCC DCC submitted.


             First Batch of Mark Up/Red Line Drawing for Approval to NKY Consultants for Site 32-32H


             Together with the Construction Manager for Site 32H Engr Sharaf  at his office checking and making mark up on the drawing for his buildings.


                  Together with the Construction Manager for Site 32 Engr Mothana Al Kadro at his office asking some information regarding mark up drawing for his buildings.  

Aerial View Photos 12-29-18

Al Ardha Site 32H













Al Ardha Site 32



















Thursday, December 27, 2018

NKY Engineer's from Head Office

               
              Arrival of NKY Engineer's from Head Office in Riyadh and being welcome by our RTCC and NKY site Engineer's.






     Preparation of the Meeting at NKY Site Office of Area Manager in Al Ardha Site 32/32H




                An on going closed door meeting and being presided by NKY Engineers from Head Office in Riyadh, tackle some drawing issues, Quality issues and some other work issues pertaining the on going process of work on site.




























                     A visit at site 32 and site 32H together with NKY Engineer's from Head Office and being accompany by RTCC Engineer's inspected some building's like wall tiles,floor tiles and painting.