Mark Up/Red Line Drawing Preparation and Approval



               Mark up/Red Line drawing checking with NKY Area Manager Engr Ameer Abu El Nasr in his office Al Ardha Site 32-32H
   

                  NKY Area Manager Engr Ameer Abu El Nasr together with Engr Nasser(Civil Engineer-left) and Arch Walli Ullah (Architect-center) having a discussion regarding the mark up/red line drawing process in which RTCC DCC submitted.


             First Batch of Mark Up/Red Line Drawing for Approval to NKY Consultants for Site 32-32H


             Together with the Construction Manager for Site 32H Engr Sharaf  at his office checking and making mark up on the drawing for his buildings.


                  Together with the Construction Manager for Site 32 Engr Mothana Al Kadro at his office asking some information regarding mark up drawing for his buildings.  